HERE is a round up of road works happening in and around Worcester this week so you can plan your journey.
* Labrador Road in Worcester is closed until December 7 for footway reconstruction and tactile crossing installation
* Broomhall Way in Worcester is closed until February 10 next year for closure to allow for construction and installation of the new footbridge and flood alleviation works in Power Park. Temporary speed limit (30mph) in place for the protection of the temporary crossing facility
* Durham Road in Ronkswood, Worcester will be closed until tomorrow (November 30) for urgent excavation in the highway to locate and repair LV cable fault.
* Tunnel Hill in Worcester has traffic lights (two-way signals) until December 4. The work began on November 2.
* Grand Stand Road in Worcester - delays possible until December 18 to allow lifting operations for Sabrina Bridge work.
* Temeside Way, Worcester - traffic control (two-way signals) until December 7. The temporary traffic lights are in order transfer westbound traffic onto the new westbound carriageway.
* Station Road - road closure until December 4 for upsizing highway drainage culvert and drainage improvement works to alleviate regular flooding issue and winter hazard
* Church Street, Malvern - traffic control (multi-way signals) until December 7
* Croome Road, Defford - road closure until December 1 to repair 'significant leakage'.
Comments: Our rules
We want our comments to be a lively and valuable part of our community - a place where readers can debate and engage with the most important local issues. The ability to comment on our stories is a privilege, not a right, however, and that privilege may be withdrawn if it is abused or misused.
Please report any comments that break our rules.
Read the rules here